Seeking a home for dance and musical events produced by students, Mesa Community College decided on a $11.5-million project that morphed a 26,000-sq-ft movie house into a 48,000-sq-ft performing arts center.

Begun in March 2013, the 19-month project reused approximately 75% of the existing movie theater, including walls, floors and roof for “back of house” components and classrooms. A 460-seat multipurpose theater acts as the new facility’s centerpiece. Other spaces include performance classrooms, solo and group music practice spaces, faculty offices and a performance lobby space. A new entry courtyard was created by removing the roof from one of the old theaters at the intersection of the new and existing structures.

项目工程师要求所有交易在现场建立模型,以供业主和设计团队批准,包括块,灰泥,墙板,油漆,聚合混凝土样品,礼堂座椅和灯具。

该公司项目工程师布雷克·迪克曼(Blake Dijkman)表示,模型导致了灌浆颜色的一些变化,还帮助总承包商莱顿建筑(Layton Construction)揭示了任何潜在的障碍。

Dijkman说,船员形成了蚀刻混凝土,然后通过“在仍然是绿色的混凝土上涂上酸样产品,然后将其洗净,然后将其涂抹,然后将其洗涤。” Dijkman说。“模型大约是混凝土表面积约12平方英尺,需要350加仑的水才能洗涤。”

他说,模型上使用的大量水导致建筑团队协调房屋礼堂的倒入,因此可以向前排进行电力清洗,然后可以将水抽出建筑物。

该建筑的美学外观建筑的灵感来自珍贵的歌曲,创意重新设计和索诺兰沙漠的音乐结构。

北砌体墙沿着沿对角线的沿线折叠,该线源自乔治·格什温(George Gershwin)的“ Rhapsody In Blue”的开口单簧管Glissando。在原始剧院中坐下的座椅代表歌曲中的音符,用于其他装饰元素。

在超过140,000个工作时间内没有可记录的安全事件。该团队特别注意预防坠落的梅森,在多个高度上建立了外部砌块墙。

Dijkman说:“砌体是通过使用围绕性能空间周围竖立的泥塔来实现的。”“这创建了一个可调节的平台,要求工作人员在完成每个升降机时齐声摇动。”


梅萨社区学院表演艺术中心

亚利桑那州梅萨。

Key Players
所有者/开发人员
Maricopa社区学院
Lead Design Firm琼斯工作室
承包商莱顿建筑公司
结构工程Rudow&Berry
机械和管道工程AME咨询工程师
电气工程伍德沃德工程
分包商铜状态墙系统、MAG建设Canyon State Electric, Comfort Systems, RKS Plumbing, Barbizon Lighting, Jones Concrete, Ikon Steel, Bernie’s Brass, Sunland Asphalt