所有者埃德蒙顿市和埃德蒙顿体育馆公司
Lead Design Firm霍克
建造ManagerPCL Construction
土木工程师Stantec
Structural EngineerThornton Tomasetti
MEP工程师M-E工程师公司
专案经理ICON Venue Group


国家曲棍球联盟的埃德蒙顿油人队的新家,这是110万平方英尺,6.137亿美元的罗杰斯广场竞技场,为该城市的市中心地区奠定了重大振兴,促进了50亿美元的私人和公共发展。这是第一个获得LEED Silver认证的加拿大NHL设施,它是第一个根据保证最高价格合同交付的城市项目。

More than 80,000 sq meters of material was removed during excavation to make way for a below-grade parking garage, which sits beneath a suspended ice slab at grade—an atypical design for an NHL arena. Most NHL ice slabs are placed on a sub-base made of clay and gravel; at Rogers Place, the 8-in. ice slab, consisting of 51,000 linear ft of pipe, sits atop a 16-in. concrete structural slab, which lays on top of the parking garage. Close to 40 concrete trucks were needed to complete the slab placement, which required over 320 sq m of concrete.

Crews installed 9,000 tonnes of structural steel over a one-year period. Also included under the scope of the project were Ford Hall, the Downtown Community Arena, light-rail transit connections and a pedestrian walkway.


相关文章:全球的最佳项目18luck官网奖项2017