SR 9B from I-95 to North of US 1 New Road Construction
Jacksonville, Fla.
Award of Merit

Owner:Florida Dept. of Transportation, District 2
Lead Design Firm:Arcadis U.S. Inc.
General Contractor:Superior Construction Co. Southeast LLC
Lighting/ITS/Structures Support:DRMP Inc.
Geotechnical Engineering:AMEC


新路的design-build-finance方法缺点truction of State Road 9B from Interstate-95 to north of U.S. 1 included construction of approximately 2.8 miles of State Road 9B and a full cloverleaf interchange at I-95 and SR 9B. The project also involved widening 2.75 miles of I-95 to eight lanes from six, construction of a full access interchange at US 1 and SR 9B, full reconstruction of two miles of U.S. 1 and construction of eight bridges. A sound barrier was installed along with 15,000 linear ft of storm drainage and 2 million cu yd of embankment. During the bid process, Superior and Arcadis submitted an alternative technical concept (ATC) design that significantly reduced the bridge structure requirements for the SR-9B/I-95 interchange, resulting in overall cost savings.


Related Article:Projects Shine With Construction Savvy