Mayne Pharma’s Oral Solid-Dose Commercial Manufacturing Facility
Greenville, N.C.
Award of Merit

Owner:Mayne Pharma
Lead Design Firm/MEP Engineer:Middough Inc.
Construction Manager:BE&K Building Group
土木工程师:The East Group
Structural Engineer:管家马nufacturing


Mayne Pharma’s 155,000-sq-ft facility includes 128,000 sq ft of operational space along with more than 27,000 sq ft of mezzanine space for critical mechanical, electrical and high-purity piping systems.

One challenge was the project site’s low elevation, coupled with a high water table. Once contractors cleared the site of trees and removed the top layer of soil, crews constructed ditches to drain water from the site. Ultimately, crews raised the entire 21-acre site by 6 feet prior to constructing the building pad.

Weather conditions also challenged the project team. During the first winter, bad weather delayed grading work by about six weeks. To mitigate adverse impacts to the project’s schedule, the contractor modified the construction sequence for erecting the pre-engineered metal building, enabling crews to begin steel erection two weeks earlier than planned.

BE&K Building Group was responsible for all process equipment purchasing, submittal reviews, receiving, unloading, staging and installation of the facility’s equipment. The project required the simultaneous installation of 24 mechanical and process air-handling units on the facility’s mezzanine level, which demanded close coordination with the mechanical subcontractor.

总体而言,新工厂比梅恩·梅纳(Mayne Pharma)的四倍体口服固体剂量药品制造能力更多。