With floors 10 and 11 of Seattle’s 58-story Rainier Square Tower under construction concurrently, crews from The Erection Co. are meeting or exceeding speed predictions for the radical composite steel frame’s steel erection, core welding and core concrete casting, says Lance Richotte, TEC’s president.

他说,通过低于六分之后的停车水平和一到高于九年级的水平,“我们每周平均每周1.36层或55天的楼层15个。”“鉴于该项目第一阶段的复杂性,天气和在一年中的西雅图缺乏日光的复杂性,我们非常满意。”


概念证明

由建筑师NBBJ设计的混合用途塔与结构工程师Magnasson Klemencic Associates(MKA)设计,是一个850-ft-tall “proof of concept” for a new high-rise framing systemexpected to take 40% less time to build than a reinforced concrete core surrounded by a steel perimeter frame. TEC predicts superstructure work will take about a year.

在租赁Crutcher Lewis建造的塔楼,具有复合钢框架,剪切壁芯包括由交叉钢板壁的模块化夹层系统,底座充满混凝土。钢板用作永久性模板,没有加强钢。

该项目被称为潜在的游戏更换者,在高层建筑竞技场密切关注,特别是MKA。该公司的办事处在32岁nd邻近的雷尼尔塔楼,a40-story building overlooking Rainier Square

“Rainier Square brings together my insatiable search for ‘better,’ passion for research and development and intense collaboration with the entire design and construction team to create a breakthrough in how tall buildings are constructed,” says Ron Klemencic, MKA’s chairman and CEO, the 2018 ENR Award of Excellence winner and the mastermind behind the structural design of Rainier Square Tower.