A panel of industry veterans spent many hours reading and analyzing the record number of entries received for ENR’s Global Best Projects competition, now in its 10Th年。与ENR受欢迎的美国地新利luck区和全国比赛类似,全球最佳项目识别并认可了过去一年中杰出的设计和建筑工作背后的项目团队。18luck官网对于位于18luck官网美国竞争的项目,他们的项目团队必须包括来自美国以外的公司
Winners this year include 34 projects located in 18 different countries on every continent except Antarctica. These outstanding examples show the risks, rewards and hurdles overcome when designing and building internationally.All of the selected projects will be spotlighted in more detail in the Dec. 12 issue of ENR. In addition, that special issue will name which one of the Global Best Project-level winners will earn the coveted title of 2022 Global Project of the Year.
如果他们有任何与建筑有关的死亡,则没有任何条目可以参加,并且在2021年1月至2022年5月之间必须完成施工。
Judging the contest were: Michael Cannon, CEO/Chairman of KHS&S Contractors; Ginger Evans, President of Tower Consulting; Chris Heger, Vice President, Chief Innovation Officer of OAC; Lucas Lahitou, Head of Origination and Structuring for Shikun & Binui Concessions USA Inc.; David Miles, Kiewit Infrastructure Group President; Bob Prieto, Chairman and CEO of Strategic Project Management; Jay Reiser, Principal at Miyamoto International; Ahmad Sarshory, Senior Project Engineer at Keville Enterprises; Irena Savakova, Vice President, Global Design Principal at Leo A Daly; and David White, Engineer and Construction Manager at Watercare Services Ltd.
Any judge with a conflict of interest in any particular category was assigned to a different category. The panel looked at projects in many markets and examined safety performance, innovations, challenges, and design and construction. They also considered how the project benefits the local community and/or the construction industry.
该小组有酌处权将顶级选择指定为各种类别的全球最佳项目获奖者,并选择有必要的优异获奖者奖。18luck官网
This year, everyone worldwide has a chance to celebrate these global construction achievements and mingle with teams behind the projects at ENR's virtual awards event. To receive information about the Global Best Projects awards presentation in December, please visitwww.pjbjkak.com/global-best-projectsor sign up for more这里的信息。
Airport/Port
最佳项目:Hadarom Port,位于以色列Ashdod。由中国港口工程有限公司提交
Award of Merit: Cape Lambert Dolphin Upgrade, located in Pilbara Region, Australia. Submitted by Aurecon
Award of Merit: Seaplane Facilities at Velana International Airport, located in Malé City, Maldives. Submitted by Beijing Urban Construction Group
Bridge/Tunnel
Best Project: Canal Lachine Cable Stay Bridge, located in Montréal, Canada. Submitted by Parsons
Award of Merit: 4th Ring Transportation Corridor in Zhengzhou, located in Zhengzhou, China. Submitted by SUN Engineering Consultants International Inc.
Award of Merit: Nanjing Jiangxinzhou Yangtze River Bridge, located in Nanjing, China. Submitted by CCCC Highway Consultants Co.
文化/崇拜
最佳项目:Viby图书馆和文化中心,位于丹麦VibySjælland。由WSP丹麦提交
优异奖:位于埃及新行政首都的新行政首都的伊斯兰文化中心。由阿拉伯承包商提交
Education/Research
Best Project: Wurun Senior Campus, located in Melbourne, Australia. Submitted by GHD
功绩奖:位于爱尔兰都柏林的Grangegorman大学。由FCC提交
Environmental
Award of Merit: The Development of South Valley of Toshka Region, located in Toshka, Egypt. Submitted by Hassan Allam Holding
Government Building
最佳项目:美国大使馆Niamey,位于尼日尔尼亚米。由BL Harbert International提交
绿色项目
最佳项目:Ken Soble Tower -500 MacNAB,位于加拿大汉密尔顿。由PCL Constructors Canada Inc.提交
Health Care
Best Project: Lakeridge Gardens, located in Ajax, Canada. Submitted by PCL Constructors Canada Inc.
优异奖:位于爱尔兰都柏林的国家法医精神医院。由Ohla提交
优异奖:位于墨西哥蒂华纳的Torre Medica Otay。由Piza International提交
Manufacturing
最佳项目:Chuan Malt Whiskey Distillery,位于中国Emeishan。由PM组提交
办公室
最佳项目:Google Bay View,位于加利福尼亚州山景城,美国北加州Sares Regis Group提交的美国
Power/Industrial
Best Project: Ras Ghareb Gulf of Suez 262.5-MW Wind Farm, located in Ras Ghareb, Egypt. Submitted by Orascom Construction S.A.E
Award of Merit: Samawa 750 MW Combined Cycle Power Plant Project Phase 1, located in Samawa, Iraq. Submitted by ENKA İnşaat ve Sanayi A.Ş.
Rail/Transit
Best Project: Adly Mansour Transportation Hub, located in Cairo, Egypt. Submitted by The Arab Contractors
Renovation/Restoration
最佳项目:Matta Sur社区和健康中心,位于智利,智利圣地亚哥。由Luis Vidal + Architects提交
优异奖:位于埃及开罗的Mohamed Mahmoud Khalil博物馆的翻新。由阿拉伯承包商提交
Residential/Hospitality
Best Project: The Habitas Resort, located in AlUla, Saudi Arabia. Submitted by AECOM
Retail/Mixed-Use Development
功绩奖:喀麦隆Yaoundé城市综合大楼,第1阶段,位于喀麦隆Yaoundé。由CCCC First Highway Engineering Group Co.提交
Road/Highway
Best Project: Yunnan Huali Expressway, located in Lijiang, China. Submitted by CCCC
Award of Merit: Cameroon Yaoundé Douala Freeway, Phase 1, located in Yaoundé, Cameroon. Submitted by CCCC First Highway Engineering Group Co.
Award of Merit: Toll Road Development of Cileunyi—Sumedang—Dawuan Phase III, located in Bandung, Indonesia. Submitted by China Road and Bridge Corp.
Specialty Construction
最佳项目:小学教师宿舍,位于莫桑比克Mucombeze。由Shook Construction提交
Sports/Entertainment
最佳项目:天富农业博览会,位于中国天武。由structurecraft提交
功绩奖:位于柬埔寨金边的Morodok Techo国家体育场。由中国国家建筑工程公司提交。
水/废水
Best Project: San Wai Sewage Treatment Works – Phase 1, located in Hong Kong Special Administration Region, China. Submitted by China Harbour Engineering Co.
Award of Merit: Iqaluit Water Crisis, located in Iqaluit, Canada. Submitted by WSP Canada
Award of Merit: SA Water Zero Cost Energy Future Program, located in various locations across South Australia. Submitted by Aurecon