Stacy and Witbeck Inc. was awarded a contract by Valley Metro’s rail board to serve as construction manager for the Tempe Streetcar project. This will be the region’s first streetcar line according to a press release, which also stated that Valley Metro and Stacy Witbeck Inc. will partner with the city of Tempe, Ariz., project designer Stantec Consulting Services Inc., a handful of local community members, and five project artists for the streetcar line.
Tempe Streetcar Line将沿着Rio Salado Parkway从Marina Heights Development West到Mill Avenue跑到Mill Avenue,然后在磨坊和灰途中的灌木丛中循环,然后继续南方·鲍埃瓦尔省。然后,有轨电车终于终于跑到Dorsey Lane,连接到Dorsey / Apache Blvd.车站。
3英里的路线预计为1,86,000,000美元,将在今年晚些时候开始施工,并为2020年开放发布。
Stacy and Witbeck Inc. has experience in this type of project, having recently completed the Kansas City Streetcar line. Stacy and Witbeck Inc. and Sundt are also currently working on the light rail extension and Gilbert, Ariz. and have constructed 13 miles of Valley Metro’s light rail line in Arizona.
Pearce支持新墨西哥州炼油厂
2月,美国代表。史蒂夫珍珠(R-N.M。)发布了一份声明,支持建设新墨西哥州的新炼油厂。自2013年以来,他一直在履行这笔交易,并相信新的炼油厂将为国家带来高薪工作,并为新墨西哥州提供新的墨西哥“世界上最强大的石油经济性”。
“One item of note,” Pearce says in a statement on his congressional website, “is the construction and operation of a new oil refinery that would be built using private funds.” Pearce asserts he has “offered to work with the democrat leadership in the State House and Senate to get the most environmentally friendly, state of the art construction” for proposed oil refinery, claiming that [New Mexico] “has infrastructure that can potentially strengthen our communities and promote production capabilities.”
Pearce recently presented the potential oil project to the Trump Administration. In his statement, Pearce says he is working “towards a stronger New Mexico” as he aims to bring the state “opportunities ...jobs and great economic development.
大峡谷大学首次亮相主要的商业中心
大峡谷大学will debut a brand new 325,000-sq-ft office complex, renovated hotel, restaurant, and an education innovation center on the northeast corner of 27th Avenue and Camelback Road in Phoenix. The new complex will be replacing an old hotel, adult shop, swap mart, and used car lot.
该大学的总体37英亩的发展将包括130万平方英尺的办公室,零售和停车位。该网站还可以向谷地铁轻轨系统举办拟议的延伸。
El新利luckliott D. Pollack&Compor的研究表明,新发展的年度经济影响将达到6.6亿美元,旅游业将占地980万美元进入当地经济。根据同一研究,发展的发展本身拥有1.7亿美元的产量,也称,这也表示,一旦基础设施完全建立,国家将每年收集260万美元的税收,县净值为1000万美元,城市收集200万美元新利luck从复合体内产生的小学和二次税收收入。
内华达大多数的桥梁举起来,但国家仍然面临133亿美元
根据NDOT的国家公路保存报告2017,内华达署需要估计的1.33亿美元,升级其2,008座桥梁的31座,这些桥梁被认为处于劣势状态。

In 2015 and 2016, after federally-required assessments used to determine health and lifespan of bridges, NDOT reported that Nevada faced $17 million in repairs for 27 bridges.
除了桥梁维修外,内华达还拥有巨大的工作堆积,以便改善国有街道和高速公路。Nevada has major improvements lined up this year that include an $11 million dollar project on U.S. Highway 93 and a $4.6 million upgrade along Charleston Boulevard in Las Vegas as well as big plans for rural areas with a $20 million project on U.S. Highway 95 near California, a $14.6 million improvement of U.S. Highway 6 in White Pine County near Ely, and a $9 million upgrade for U.S. Highway 93 south of Wells in Elko County, according to the report.
内华达州的路面康复工作的积压为4502百万美元,NDOT在2015年和2016年花费了18660万美元,以维持或恢复450英里的路面。
South Central Light Rail Bids Open
凭借联邦批准,谷地铁现在正在追踪南中央灯路推广工作,该延长将由运输资助2050,35年,多模态运输计划。
目前目前正在接受拟议的五英里双轨,这些双轨将在基线道上连接到基线道。去年,凤凰城市委员会同意快速跟踪南部中央延伸包括南中央延伸的一部分,这意味着新轨道将在2023年以2034年开放。
According to a Valley Metro press release, it’s stated that the “route would connect with the existing line at Washington and Jefferson Streets using a one-way couplet, with southbound operations on 1st Avenue and northbound operations on Central Avenue, before converging at Hadley Street to operate within the Central Avenue median bi-directionally to its terminus at Baseline Road.”

A Pre-Proposal Conference will be held Tuesday, March 7, 2017 at 3 pm. at Nina Mason Pulliam Rio Salado Audubon Center, 3131 S. Central Ave., Phoenix, 85040. Proposals are due March 30, 2017 by 3 p.m. MST.