This Website Uses Cookies 通过关闭此消息或继续使用我们的网站,即表示您同意我们的cookie政策。学到更多本网站需要某些饼干来工作,并使用其他cookie来帮助您获得最佳体验。通过访问本网站,已经设置了某些cookie,您可以删除和阻止。通过关闭此消息或继续使用我们的网站,即表示您同意使用cookie。访问我们的更新隐私和饼干政策了解更多。
Built to help fish traverse the Deschutes River, Tumwater Falls Hatchery welcomes 250,000 annual park visitors and 3.8 million Chinook salmon each year.
波特兰,俄勒冈州基甸街天桥。now links the old and the new with a bicycle and pedestrian bridge over five separate railway tracks, crossing the TriMet light rail and Union Pacific Railroad tracks, and restoring an important connection in the Hosford-Abernethy neighborhood.
As a telecommunications company, T-Mobile US knows the power of strong connections. The team renovating its Bellevue, Wash., headquarters paid special attention to connecting multiple buildings throughout the campus, which spans more than 1 million sq ft of office space.
Built in 1908, Seattle’s historic Webster Elementary School underwent repeat renovations in the subsequent decades that packed the structure with engineering surprises.
Situated on a hilltop with panoramic views of four iconic Northwest mountains, Willamette National Cemetery’s natural landscape both helped and hindered its phased expansion. The design-build project for the Dept. of Veteran Affairs (VA) expanded and improved the cemetery after a 38.2-acre land acquisition.
Time was on the side of the team building the California Creek Fish Passage Project, designed to replace the stream crossings beneath four separate roadways to better support the area’s fish and wildlife.