在加利福尼亚州布里斯班的网络科实验室项目,该项目将把其废物的90%以上从垃圾填埋场和焚化中转移,将成为第一个满足总资源使用和效率为零的零浪费标准的人。
。该项目跨越五平方英里,每年将产生超过2,200 GWH的可再生能源。
保持加利福尼亚设施开放至2035年将减少州碳排放,并节省26亿美元的电力成本。18luck.cub
The team working on the troubled foundation fix of the settling Millennium Tower has switched gears again due to equipment troubles.
City will receive a $224-million loan toward a $458-million advanced water purification facility.
道奇提供有关2021年河滨地区帐单施工的数据。
作为历史悠久的灰色豪宅不可或缺的一部分,一个34个座位的前电影剧院进行了面对面的改装,以21世纪的声学和视听系统来恢复其独特的室内设计。
>建于1893年,旧金山的市场街铁路发电厂曾经是该国最大的发电设施。为该城市的第一辆有轨电车提供动力的历史悠久的砖砌建筑现在已经去了狗,猫和其他小动物,因为该市的动物控制和护理设施。
The 313,000-sq-ft, mixed-use building includes much needed affordable housing for UCLA Medical’s staff of residents, fellows and interns as well as retail space and underground parking.
Precision was a critical component for the first phase of the Vantage Data Centers campus in Santa Clara, Calif. From the clean, geometric designs to the prefabricated materials and careful placement of every light switch and alarm strobe, the two four-story buildings are precisely calibrated for maximum efficiency.
As COVID-19 spread through Los Angeles County’s growing homeless population, the team designed, built and received final approvals in just 120 days for a 60,000-sq-ft interim housing facility.
Located in Walnut Creek, Calif., the $130-million Viamonte senior complex meets several ambitious—and sometimes conflicting—goals at once: a small community fitting seamlessly into a larger mixed-use development; condos designed for independent living that also allow for assisted care; and an enclosed courtyard built around an existing 500-year-old oak tree.
The new 10-acre waterfront retail center boasts outdoor plazas, patio dining and more than 90,000 sq ft of retail, boutiques, restaurants, a bank and marine office space, all clad in a variety of modern architectural motifs.
Located in the heart of West Oakland, the 45,000-sq-ft facility supports a central kitchen for district-wide food production, a culinary arts education center and an urban farm.
The Park Point Landscape project transformed four acres of flat Silicon Valley land into a lush environment of rolling hills topped with native plants and grasses.
This 23,000-sq-ft building is the first step in a campus-wide strategic effort to reimagine the modern learning environment.
An unexpectedly long rainy period seemed certain to overwhelm the high school’s new stormwater protection plan.
The smoother, safer path afforded by the three-mile truck climbing lane and wider shoulders belies the unexpected challenges encountered during the three-year construction process.
Caltrans和项目团队之间的紧密建设前合作产生了许多节省成本的创新,这有助于将预算减少近4000万美元,同时还有助于加快在美国395号公路和邻近的货运线路上提升SR 58的过程。
创建的旨在为电影制作和计算媒体提供联系,该设施具有媒体实验室,教室,实验内容创建空间,声音舞台,后期制作的编辑套件和100个座位的杜比大气筛选剧院。
>Pursuing LEED Gold accreditation and delivered via progressive design-build, the innovative $96-million, 115,000-sq-ft building is a long-awaited athletics and educational resource for the college and surrounding community.
克服从钢制造和许可证到野火和全球大流行的潜在延误,三级设施在建设开始后仅两年就完成了。
癌症诊所是一系列原型Cedars-Sinai用于扩展产品并开发提供新的医疗服务的方法的第二个。
This laboratory challenges the traditional sterile aesthetic of research facilities by combining three warehouses into a single incubator lab, augmented by a three-story addition. The complex MEP system addresses specific operational requirements for offices and labs.
Completed in just over two years, the 17-story, 340-000-sq-ft office building is the U.S. Navy’s first high-rise and the federal government’s first collaboration with a private developer for a build-to-suit office building.
Located on a 4.7-acre former brownfield, the two-story library and arts center provide the centerpiece of the city’s effort to create a walkable arts and community center.
The $344-million, five-story connection between Terminals 1 and 2 provides nearly 240,000 sq ft for ticket counters, baggage carousels, a bus gate and an additional screening checkpoint as well as a vertical circulation core that will connect with LAX’s future automated people mover.
要补救地震安全问题并增强混凝土稀薄大坝的洪水处理能力,这是一个耗资3200万美元的项目,要求在现有结构中切割一个档位,将新的OGEE形溢洪道放置在新的OGEE形溢洪道上,并在该结构上安装了钢筋装甲dam’s base.
As part of the replacement of a critical bridge serving the ports of Los Angeles and Long Beach, the project team developed a strategy to install two 2.1-million-lb precast concrete bridge fenders to safeguard the structure from vessel impacts.